| Education,
Experience & Location |
|
|
|
|
| Resume ID: |
102453 |
| Location: |
Italy Italy Manziana (Rome) | |
| Education: |
High school |
| Experience: |
20+ Years | |
|
|
|
| Resume |
|
|
|
Objective Life Support Supervisor conducting Saturation Systems
Work Experience Period: 04 – 10 – 1967 till 31 - 12 - 69
Position: Air Diver
Vessel:
Client: Italian Navy
Project/Location: Cosubin Varignano La Spezia Italy
Work Description: Training course and SDAI in the Navy and destinations in various locations
Period: 06 06 1970 till 10 08 1970
Position: Air diver
Vessel: Shore Work
Client: Agip
Project/Location: Marghera Refinery Venice
Work Description: Demolition of Wall to allow water entering
Period: 13 09 1970 till 20 12 1970
Position: Air Diver
Vessel: Shore Dam
Client: Warter and electricity of Sudan
Project/Location: Kashmel Girba Sudan
Work Description: To Clear aspirations gates from debris
Period: 02 06 1971 till 10 09 1971
Position: Air Diver
Vessel: Shore
Client: Shell BP.
Project/Location: Warry Nigeria Shell Bp
Work Description: General maintenance and services
Period: 20 11 1971 till 12 08 1973
Position: Air Diver
Vessel: Shore
Client: Agip Saipem
Project/Location: Tanzania Dar es Salaam
Work Description: To make a trench on reef using also explosives and lay pipe line till SbM Boa and connection .
Period: 15 09 1973 till 18 12 73
Position: Air diver
Vessel: Saipem Castoro 4
Client: Saipem
Project/Location: Busheer
Work Description: Pipe line lay , risers and flanges installation
Period: 06 04 1974 till 10 06 1974-----------and --------09 08 till 03 11 1974
Position: Air diver
Vessel: Castoro 6
Client: Saipem
Project/Location: Emirates
Work Description: Pipe line to lay , Spool peaces assembly and flanges installation
Period: 11 01 1977 till 14 03 77
Position: Air Diver
Vessel: Freebooter
Client: Sub Sea Oil Services
Project/Location: Porto santo Stefano Italy
Work Description: Cutting and Welding training plus use and practice of surface demand and special apparatus as Sms 1 for deep diving to follow deep diving gas mix training course
Period: 16 03 77 till 04 05 77
Position: Gas mix training air diver
Vessel:
Client: Sub Sea Oil Services and Shell BP
Project/Location: Wet and Dry Zingonia Bergamo Italy
Work Description: Simulation of gas mix dives in real pression to become Sat Diver
Period: 23 05 1977 till 29 06 1977
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Auk Alfa north sea
Work Description: To clear area from debris
Period: 18 09 77 till 16 10 77
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Dan Alfa North Sea
Work Description: Corrosion Tests photos MPI
Period: 01 12 77 till 02 01 78
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Brent north sea
Work Description: Saturation to corrosion test
Period: 31 05 1978 till 11 07 78
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Brent norh sea
Work Description: Saturation Ndt MPI Cleaning areas
Period: 21 07 1978 till 11 08 1978
Position: Sat Diver
Vessel: Semac Lay Barge
Client: Shell BP
Project/Location: Brent /A North Sea
Work Description: Spool peaces assembly and Measures for other Spool
Period: 25 09 1978 till 28 10 1978
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Auk/a Brent/D
Work Description: Inspections NDT MPI PHOTOS
Period: 12 08 1979 till 15 09 1979
Position: Sat Diver
Vessel: Capalonga
Client: ShellBP
Project/Location: Brent North Sea
Work Description: Cleaning MPI debris
Period: 10 10 1978 till 27 10 78
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Brent North Sea
Work Description: Clamps fittings debris Ndt photos
Period: 28 11 78 till 26 12 78
Position: Sat Diver
Vessel: Capalonga
Client: ShellBP
Project/Location: Brent North sea
Work Description: Debris Inspections photos MPI
Period: 03 02 1979 till 28 02 1979
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Brent North Sea
Work Description: Clamps inspections istallation MPI
Period: 23 04 79 till 06 05 1979
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Brent North SEA
Work Description: General maintenance MPI NDT PHOTOS
Period: 06 06 1979 till 10 07 1979
Position: Air Diver
Vessel: Scarabeo 3 Saipem
Client: Saipem Agip
Project/Location: Lybia
Work Description: Assistence to Closed bell modular
Period: 09 02 1980 till 24 02 1980
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Shetland Ilands
Work Description: Cadweld on pipe line (Welding anodes)
Period: 27 03 81 till 16 04 81
Position: Sat diver
Vessel: ArcticSeal
Client: Shell BP
Project/Location: North Sea
Work Description: Spool Peaces assembly Sand bagging
Period: 17 05 81 till 05 06 81
Position: Sat diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: North Sea
Work Description: MPI Inspect. Cleaning nodes
Period: 03 07 81 till 01 08 1981
Position: Sat diver
Vessel: Arctic Seall
Client: Shell BP
Project/Location: North Sea
Work Description: Pibe Line joint sand bagging and photos MPI
Period: 04 03 1982 till 27 03 1982
Position: Sat Diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: Brent /B Cormoran Alfa
Work Description: Works on igloo
Period: 12 07 82 till 07 08 82
Position: Sat Diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: North Sea Cormoran
Work Description: Jointing hoses to flanges water jetting cleaning photos
Period: 20 09 82 till 15 10 82
Position: Sat Diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: North Sea
Work Description: Sand Bagging at span flag photos
Period: 19 04 1983 till 14 05 83
Position: Air Diving
Vessel: Buccaneer Congo
Client: Agip Eni
Project/Location: Loango field
Work Description: Cleaning by water jet brushes MPI NDT inspect
Period: 15 05 83 till 14 06 83
Position: Sat Diver
Vessel: Buccaneer mv
Client: Agip Eni Congo
Project/Location: Loango field Cong
Work Description: NDT on Knots
Period: 25 07 83 till 30 08 83
Position: Sat Diver
Vessel: Buccaneer mv
Client: Agip Eni Congo
Project/Location: Loango field
Work Description: NDT MPI POTOS on Knots
Period: 20 11 1983 till 19 12 83
Position: Sat diver
Vessel: Bucaneer Mv
Client: Agip Eni Congo
Project/Location: Loango fields
Work Description: NDT MPI Photos, repair damages of corrosion
Period: 05 04 84 till 28 04 84
Position: Sat Diver
Vessel: Buccaneer mv
Client: Agi Eni Congo
Project/Location: Loango Field
Work Description: MPI NDT Inspect repair damages corrosions
Period: 08 10 84 till 27 10 84
Position: Sat Diver
Vessel: Saipem Crawler Lei Barge
Client: Saipem
Project/Location: BODP/Sarawac Malaysia
Work Description: Assistance To lei Barge production
Period: 29 10 84 till 24 11 84
Position: Air diver
Vessel: Saipem Crowler
Client: Saipem
Project/Location: Sarawak Malaysia
Work Description: Pipe Line till shore removing drums
Period: 28 03 86 till 26 04 86
Position: Sat Diver
Vessel: Buccaneer Mv
Client: Agp Eni Congo
Project/Location: Loango Field
Work Description: Grining and repairing corrosion Cutting Bressing damaged
Period: 14 11 86 till 15 12 86
Position: Sat Dver
Vessel: Buccaneer Mv
Client: Agip Eni Congo
Project/Location: Loango Field Congo
Work Description: Cutting Frame conductor , Putting Clamps brace on sostitution
Period: 01 06 87 Till 20 10 87
Position: Sat Diver
Vessel: Buccaneer Congo
Client: Agip Eni Congo
Project/Location: Loango field
Work Description: Putting blocks to anchor strings for cathodes protection, and fixing stings
Period: 01 05 89 till 30 09 89
Position: Sat Diver
Vessel: Anfitrite mv
Client: Agip
Project/Location: Adriatic Sea Italy
Work Description: NDT MPI Knots control
Period: 01 02 90 till 31 10 90
Position: Sat Diver
Vessel: Anfitrite mv
Client: Agip
Project/Location: Adriatic sea Italy
Work Description: Spool Peaces and risers installing NDT MPI
Period: 01 08 91 till 31 10 91
Position: Sat Diver
Vessel: Dynanic Installer
Client: Lybian and Agip
Project/Location: Buri Field
Work Description: Debris MPI NDT Cleanig knots
Period: 01 07 92 31 10 92
Position: Sat diver
Vessel: Anfitride mv
Client: Agip
Project/Location: Adriatic Sea
Work Description: General services and Maintenaces MPI NDT
Period: 19 06 95 till 19 08 95
Position: Sat Diver
Vessel: cho chang constrouction
Client: as above
Project/Location: Tai Pei Taiwan
Work Description: Assrmbly Pipe Line for Waste Material elimination in sea water
Period: 26 09 95 till 27 11 95
Position: Sat Diver
Vessel: Cho Chang Constuction
Client: as above
Project/Location: Tai Pei Taiwan
Work Description: AS Above
Period: 01 11 96 till 23 01 97
Position: Air Diver appointed for Supervisor
Vessel: Crowler Lay Barge
Client: Saipem
Project/Location: Adriatic sea
Work Description: Spool peaces and camps assembly
Period: 01 06 99 till 31 07 99
Position: Ass. LST Tecnitian
Vessel: Petrobell Petrojet
Client: Petrobell Egypt
Project/Location: Suez
Work Description: Assistence to Saturation panel
Period: 01 01 99 till 01 05 2001
Position: Appointed air Diving supervisor and Diver
Vessel: Q Chem Qatar Shore
Client: Qatar Petroleum
Project/Location: Industrial Estate
Work Description: Building And Leveling for quay bench and mouring approch
Period: 01 09 2001 till 31 12 2001
Position: Sat Diver
Vessel: Lay Barge Cooec
Client: Chevron
Project/Location: Checron Field
Work Description: Layng Pipe and Spool peaces assembly and sand bagging
Period: 10 06 2002 till 31 07 2003
Position: Air Diver appointed for Diving Supervisor
Vessel: Shore
Client: Qatar Petroleum Fincosit ( G.L.F.)
Project/Location: Doha industrial area
Work Description: Leveling and building Mouring Dulphins and Quay
Period: 14 09 2003 till 31 10 2003
Position: Air Diver appointed Diver Supervisor
Vessel: Kanta
Client: Petrobel Egypt
Project/Location: Suez
Work Description: To cover pipe line by jetting cover machine under bottom
Period: 14 07 2005 till 08 09 2005
Position: Air Supervisor and Diver
Vessel: Adams surveyor
Client: Agip Eni Congo
Project/Location: Loango field Point Noire
Work Description: Saturaton Panel and assistence
Period: 29 09 2005 till 29 11 2005
Position: Air Supervisor and Diver
Vessel: Adams Surveyor
Client: Agip Eni Congo
Project/Location: Loango field Point Noire
Work Description: Saturation Panel and Assistence
Period: 26 03 2006 till 28 April 2006
Position: Air supervisor and diver
Vessel: Dynamic Installer
Client: Agip Eni Congo
Project/Location: Loango field Point Noire
Work Description: NDT MPI Cleaning knots by sand jetting
Period: 05 August 2006 till 03 October 2006
Position: LST - LSS -
Vessel: Team Muscat
Client: Petrobel Agip Egypt
Project/Location: Port Said area
Work Description: Saturation Controll Panel and assisting Closed Bell Diving Supervisor
Period: 18 November 2006 till 15 February 2007
Position: LSS Life support Supervisor SMIT Terminals
Vessel: Bourbon Peridot
Client: HESS
Project/Location: MALABO Equatorial Guinea
Work Description: Spool Peaces assembly and Hoses Replacement
Period: 02 March 2007 Till 09 March 2007-03-19
Position: LSS – Life Support Supervisor (Smit Terminals)
Vessel: Dulphine
Client: Horizont - Ghana
Project/Location: Ghana
Work Description: Preparing some gas mix quads to next bounce diving Job
Period: 20th of May till 25th of June 2007
Position: LSS
Vessel: Marmaid Commander
Client: Chevron
Project/Location: Gulf of Thailand
Work Description: Sat control Panel and Lss dutys 12 Men System two bell run
Period: 19th of July till 7th of August 2007
Position: LSS (Smit Terminals)
Vessel: Saipem3000
Client: Saipem
Project/Location: Point Noire Loango Ikalou
Work Description: Sat control Panel Gas Mixing lss dutys
Period: 20th of August till 31st October 2007
Position: LSS (Smit Terminals)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Loango Ikalou
Work Description: Sat control Panel mixing gas Lss dutys
Period: 2nd December till 27th January 2008
Position: LSS
Vessel: PMS11 and DpVessel Mayo
Client: Petrobel Egypt
Project/Location: Port Said
Work Description: Risers and Spool Peaces assembly Saturation
Period: 18th April till 22nd June 2008
Position: Lss
Vessel: Seamac Pricess Diving Vessel By Dulam (12 Man Divex System)
Client: Qatar Petroleum
Project/Location: Doha Qatar
Work Description: Spool Peaces assembly by 3 man bell run in new Divex sat system Sat
Period: 25th June 2008 till 10th July 2008
Position: LSS (Smit Terminals)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Point Noire
Work Description: Spool Peace assembly Saturation
Period: 22 August 2008 Till 2Nd October 2008
Position: LSS (Smit Terminals)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Point Noire Angola
Work Description: Spool Peace Assembly In Saturation
Period: 1st of March 2009 Till 10th June 2009
Position: LSS (Hydrodive)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Angola
Work Description: Spool Peace 45 inch assembly saturation ( 9 Men System )
Period: 17th August 2009 Till 28 September 2009
Position: Life Support Supervisor Smit Terminals
Vessel: Team Muscat
Client: MARSK Petroleum
Project/Location: Qatar
Work Description: Salvage work by Smit recover Cutted Dilling Leggs on bottom
Period: 8th December 2010 Till 8th January 2011
Position: Life Support Supervisor
Vessel: MSV dp3 BOTNICA
Client: Agip Croatia
Project/Location: Croatia Adriatic sea
Work Description: Spool pieces assembly in saturation system
Period:
Education Hight School
Certification All Imca certs |
|
|
| Contact Candidate by Email |
|
To maintain candidate's privacy we do not
reveal contact information. Please use the form below and
your request will be emailed directly to the candidate. |
|
|
|
|
|
|
|